Project: Northwest Tennessee Correctional Complex
Location: Ft. Pillow, Tennessee
CS3 installed a new underground hot water piping system at the Northwest Tennessee Correctional Complex. Over 12,000 feet of polypropylene pipe was installed underground. The pipe installed varied in size from 2 inch to 12 inch. Pre-fabrication of several sections of pipe at CS3 facilities greatly reduced field fabrication and installation time. Underground radar was used to detect obstructions and utilities prior to digging or boring being conducted.
Share :
This site uses cookies and similar technologies to analyze traffic, personalize content, and improve your experience. By continuing to use this site, you acknowledge our use of cookies. For more information, please review our Privacy Policy.